Sports surface consultancy, MUGA UK Agripower were appointed by the school in 2015 to build a full size synthetic hockey pitch alongside 4 tennis courts to LTA required standards, a sprint track with associated fencing and floodlighting and the school then instructed Landscape Perspective to assist in the planning application process by producing a landscape masterplan to accompany their submission.

The synthetic Hockey pitch was laid using a TigerTurf sand dressed Evo Pro system laid on an insitu shock-pad and the scheme included a floodlighting system and fencing. The Sprint track was a later thought which was incorporated into the project making good use of an area in the middle of the new facilities. The work was carefully programmed to avoid causing any disruption to the pupils and for the facilities to be ready for the new academic year.
Gallery
Design team
Landscape Architect: Landscape Perspective
Contractor: MUGA UK Agripower Contractors Ltd






